Numo Logo
NUMO ADHS
mamaadhd659 Avatar
mamaadhd659
9
vor 2 Jahren

Tasks

So if I have a task that will take more then a day to due. Can I assign more then one day or do I assign the subtasks each day. That seems daunting


3 Kommentare

Beiträge und Kommentare hier teilen persönliche Erfahrungen – keine medizinische Beratung. Bei Behandlungsfragen sprich mit einem Arzt.


zonedout Avatar
zonedout
24
vor 2 Jahren

i just assign it for one day if it’s not finished it still will be there the next day ;)


nm19lcytt Avatar
nm19lcytt
20
vor 2 Jahren

This is how I solved it this far (would prefer another option): I write the task with subtasks, tackle the subtasks and transfer the whole task to the next day. It gives me enough flexibility and not too much extra work


sarafaithgunn Avatar
sarafaithgunn
24
vor 2 Jahren

I have wondered the same thing


Kommentar hinzufügen